Friday 31 October 2014

Newsletter 2 November 2014



Reordering 27. 31 October 2014The

The new paving is being laid in the garden at the side of the church.
It enhances the space beautifully and makes it look much bigger.

Tuesday 28 October 2014

Wednesday 22 October 2014

Reordering 20 October 2014

The new steps to the tabernacle and reredos.
The new steel in the cloister which will be topped with an oak handrail.
The new door from the presbytery to the cloister.
The beautiful North window of the sanctuary.

Friday 17 October 2014

Newsletter 19 October 2014



Reordering 25. 17 October 2014

The 'cloister' from the garden. In the foreground
are the setts with which the courtyard will be paved
The cloister from the sacristy adorned with the two
existing stained glass windows which look very fine.
Fitting the stone nosings to the reredos steps.
The same stone will be used to edge the base of the font. 
The new sacristy cupboard which houses the mechanical and
electrical installation (and give us somewhere to put things!). 
Looking towards the sacristy door from the side entrance.

Saturday 11 October 2014

Reordering 24. 8 October 2014

Looking east towards the processional way or 'cloister'. Tiling the floor.
The light flooding into the church from the cloister.
Fixing the skirting by the font.
The door to the cloister from the side garden.
The 'parliament' hinges which allow the doors of the tea-point to open flat against the wall.

Newsletter 12 October 2014



Wednesday 8 October 2014

Reordering 23. 7 October 2014

The processional way from the side garden.
The canopy over the Parish Room entrance.