Saturday, 26 July 2014

Parish Newsletter 27 July 2014



Reordering 15. 25 July 2014

The roof is going on to the processional way
The new processional way, or should we call it 'The Cloister'?
The floor tiles for the sanctuary and narthexes
A beautiful space for meditation? Well perhaps, its the new loo!
The View From… the loo!
The South Narthex looking towards the tea point.
The tea point, complete with dishwasher, fridge and Zip boiler (for all that tea)!
With the installation of the glass screen wonderful reflections appear.

Monday, 21 July 2014

Reordering 14. 21 July 2104

The green oak frame of the processional way. Majestic!
The processional way from the front door of the presbytery.
The new coin stones to the parish room doorway.
The palette of materials, original and new.
St Patrick and Our Lady oversee the decorating of the sanctuary. No pressure!
Fitting the radiators to the east alcoves.

Saturday, 19 July 2014

Wednesday, 16 July 2014

Reordering 13. 15 July 2014

The glass in the south narthex screen (under the organ loft).
The canopy to the new north entrance.
Preparing the stone to repair the large window to the presbytery (parish room).
The view from the side entrance of the church.

Wednesday, 9 July 2014

Reordering 12. 8 July 2014

Painting the interior. The final wall colour is just to the left of the ladder.
Painting the sanctuary. Final colour to the ceiling of the nave.
Looking towards the presbytery with the two new slopes. 
No, not Paul the octopus, but the drainage from the garden. 
Looking south from the front of the presbytery towards the garage.
The green oak which will form the canopy to the new north narthex.